{"id":2137,"date":"2018-05-06T00:00:00","date_gmt":"2018-05-06T00:00:00","guid":{"rendered":"https:\/\/www.kergudon.com\/https-www-kergudon-com-sunday-06-may-complet\/"},"modified":"2020-05-12T15:55:22","modified_gmt":"2020-05-12T15:55:22","slug":"sunday-06-may-complet","status":"publish","type":"post","link":"https:\/\/kergudon.com\/fr\/sunday-06-may-complet\/","title":{"rendered":"Sunday 06 May &#8211; Complet"},"content":{"rendered":"<p>Work at the start of the week was focussed on starting to prepare all of our g\u00eetes to accept guests yesterday.\u00a0 On Monday this meant I needed to clear the parking space in front of Stable.<\/p>\n<p>Having chopped down the trees on the north end of the orchard bed a few weeks ago, we had decided to leave the branches and twigs in the parking space temporarily.\u00a0 There was too much of it to make taking it all to the d\u00e9ch\u00e8terie sensible so we decided that we would burn it at some point. However, that meat needing to drive it round to our back garden and across the lawn and it hadn\u2019t been dry enough until now.<\/p>\n<p>On the down side, this has meant that we now have a larger pile of garden waste at the end of the garden but, on the up side, it means we have to have a bonfire sometime soon ?.<\/p>\n<p>In <a href=\"https:\/\/kergudon.com\/fr\/sunday-29-april-bit-by-bit\/\" target=\"_blank\" rel=\"noopener noreferrer\">last week\u2019s blog<\/a> I mentioned that I hadn\u2019t progressed the floor in the Grange games room\u00a0 for a couple of weeks but that it was our intention to make sure that it would be done for the start of the season.<\/p>\n<p>So, on Tuesday, despite having amazing weather outside, I took the decision to go back into Grange and make the final push to the end.\u00a0 The choice of my timing was that we were due a downpour overnight Tuesday and Wednesday morning when I could remain in Grange and varnish the completed floor and repair the billiard light we have acquired.<\/p>\n<p><a href=\"http:\/\/kergudon.com\/wp-content\/uploads\/2018\/05\/Games-Room-Floor-Complete.jpg\"><img decoding=\"async\" class=\"aligncenter size-medium wp-image-3253 lazyload\" data-src=\"http:\/\/kergudon.com\/wp-content\/uploads\/2018\/05\/Games-Room-Floor-Complete-300x224.jpg\" alt=\"Games Room Floor Complete\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 300px; --smush-placeholder-aspect-ratio: 300\/224;\" \/><\/a><\/p>\n<p>The floor looks great and it means that we are within a few days of having a completed games room \u2013 for which we made another exciting purchase in the week.\u00a0 More next week if it gets delivered in the next few days although as there are 2 public holidays this week (Tuesday and Thursday) who knows when \/ if we will get a delivery!\u00a0 I just need to add some beading around the outer edge of the floor (and of course clear out all of the accumulated debris \u2013 although that is dependent on having somewhere to put it!) and we can officially open the Games Room \u2013 phase 1 complete.<\/p>\n<p><a href=\"http:\/\/kergudon.com\/wp-content\/uploads\/2018\/05\/Games-Room-Floor-Completed.jpg\"><img decoding=\"async\" class=\"alignleft size-medium wp-image-3255 lazyload\" data-src=\"http:\/\/kergudon.com\/wp-content\/uploads\/2018\/05\/Games-Room-Floor-Completed-300x224.jpg\" alt=\"Games Room Floor Completed\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 300px; --smush-placeholder-aspect-ratio: 300\/224;\" \/><\/a><\/p>\n<p><a href=\"http:\/\/kergudon.com\/wp-content\/uploads\/2018\/05\/Games-Room-Floor-Completed-2.jpg\"><img decoding=\"async\" class=\"alignright size-medium wp-image-3254 lazyload\" data-src=\"http:\/\/kergudon.com\/wp-content\/uploads\/2018\/05\/Games-Room-Floor-Completed-2-300x201.jpg\" alt=\"Games Room Floor Completed 2\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 300px; --smush-placeholder-aspect-ratio: 300\/201;\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>Since varnishing the floor I have spent a couple of days with a paintbrush or spraycan in hand.\u00a0 Now that the room is almost ready I wanted to refurbish the pool table and billiard light we have to put in.\u00a0 Having bought them together on French Gumtree both needed a little TLC.\u00a0 The light needed to be rewired and have some holes filled which I did with a fibre glass kit (simple but very messy) and the table needed a panel which had been replaced with particleboard painted to match the rest.<\/p>\n<p>I have almost finished both and we should have them in place next week.\u00a0 The other item I painted we added to the tropical bed \u2013 along with a (unpainted) variegated yucca which is harder to spot!\u00a0 We think it looks great.\u00a0 We were given it by some friends in the village who bought their house from a fisherman who left a few in their yard.\u00a0 It had always been the intention for it to go in the tropical bed as a bit of a feature but we then thought we paint it as close to Kergudon blue as we could so it will match all of the wood when that is (eventually) painted too.<\/p>\n<p><a href=\"http:\/\/kergudon.com\/wp-content\/uploads\/2018\/05\/Tropical-Anchor.jpg\"><img decoding=\"async\" class=\"aligncenter size-medium wp-image-3260 lazyload\" data-src=\"http:\/\/kergudon.com\/wp-content\/uploads\/2018\/05\/Tropical-Anchor-300x224.jpg\" alt=\"Tropical Anchor\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 300px; --smush-placeholder-aspect-ratio: 300\/224;\" \/><\/a><\/p>\n<p>Friday was back to preparing g\u00eetes as this week we are completely full for the first time in 2018 which we are delighted about.\u00a0 As there are 2 public holidays many of the French \u2018faire le pont\u2019 (make the bridge) which is basically taking the day off between a weekend and holiday.\u00a0 As there are 2 holidays there are bridges to be had Monday, Wednesday and Friday so not a lot will happen in France this week!<\/p>\n<p>We have a lovely French family in Granary who stayed with us last year; a large family reunion in Priory and Stable who have travelled from Canada, London and within France; and a Scottish couple and Westie staying with us in Hayloft.\u00a0 This has meant that Dave\u2019s parents \u2013 who also arrived with us yesterday for a week \u2013 are with us in Kergudon and Dave and I have had to move to the top floor.\u00a0 It is thankfully convenient that the storeroom was completed recently so we could see the carpet on our top floor!<\/p>\n<p>Today has been continuing to clear the boundary on our outer north talus, along Str\u00e9at al Louarn, and start the wall between Grange and what will be my new man-shed.\u00a0 As the dimensions of the new will be shorter than the existing cave I am building some steps at the far end to allow access to cut the hedge.<\/p>\n<p>From\u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0 \u00a0To<\/p>\n<p><a href=\"http:\/\/kergudon.com\/wp-content\/uploads\/2018\/05\/Streat-al-Louarn-to-be-Cleared.jpg\"><img decoding=\"async\" class=\"alignleft size-medium wp-image-3259 lazyload\" data-src=\"http:\/\/kergudon.com\/wp-content\/uploads\/2018\/05\/Streat-al-Louarn-to-be-Cleared-300x217.jpg\" alt=\"Streat al Louarn to be Cleared\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 300px; --smush-placeholder-aspect-ratio: 300\/217;\" \/><\/a><\/p>\n<p><a href=\"http:\/\/kergudon.com\/wp-content\/uploads\/2018\/05\/Streat-al-Louarn-Cleared.jpg\"><img decoding=\"async\" class=\"alignright size-medium wp-image-3258 lazyload\" data-src=\"http:\/\/kergudon.com\/wp-content\/uploads\/2018\/05\/Streat-al-Louarn-Cleared-300x224.jpg\" alt=\"Streat al Louarn Cleared\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 300px; --smush-placeholder-aspect-ratio: 300\/224;\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/kergudon.com\/wp-content\/uploads\/2018\/05\/Man-Shed-Wall-Steps.jpg\"><img decoding=\"async\" class=\"aligncenter size-medium wp-image-3256 lazyload\" data-src=\"http:\/\/kergudon.com\/wp-content\/uploads\/2018\/05\/Man-Shed-Wall-Steps-300x242.jpg\" alt=\"Man Shed Wall Steps\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" style=\"--smush-placeholder-width: 300px; --smush-placeholder-aspect-ratio: 300\/242;\" \/><\/a><\/p>\n<p>Only a few hours on that so far but hopefully I will be able to progress it next week as it is all part of getting the garage complete and having somewhere to put all of that detritus currently in the games room.\u00a0 You see how one job is so dependent on completing another \u2013 I should have been a project manager!<\/p>\n<p>Salut.<\/p>","protected":false},"excerpt":{"rendered":"<p>Work at the start of the week was focussed on starting to prepare all of our g\u00eetes to accept guests yesterday.\u00a0 On Monday this meant I needed to clear the parking space in front of Stable. Having chopped down the trees on the north end of the orchard bed a few weeks ago, we had&hellip;<\/p>","protected":false},"author":1,"featured_media":2145,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"wds_primary_category":0,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-2137","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ben-and-daves-blog"],"_links":{"self":[{"href":"https:\/\/kergudon.com\/fr\/wp-json\/wp\/v2\/posts\/2137","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kergudon.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kergudon.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kergudon.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/kergudon.com\/fr\/wp-json\/wp\/v2\/comments?post=2137"}],"version-history":[{"count":0,"href":"https:\/\/kergudon.com\/fr\/wp-json\/wp\/v2\/posts\/2137\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kergudon.com\/fr\/wp-json\/wp\/v2\/media\/2145"}],"wp:attachment":[{"href":"https:\/\/kergudon.com\/fr\/wp-json\/wp\/v2\/media?parent=2137"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kergudon.com\/fr\/wp-json\/wp\/v2\/categories?post=2137"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kergudon.com\/fr\/wp-json\/wp\/v2\/tags?post=2137"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}